The Thames Water/Barhale cavalcade is moving gradually further along Whitelands Ave to the corner of Brushwood Drive.
 
There will be a grand finale as they construct and test the final connection between existing and new sewers at the junction of Brushwood Drive and Whitelands Avenue. This will require temporary two-way traffic lights for a short period during weekdays.
 
They are looking to complete all works by mid-October and demobilise shortly after that.
 
Whitelands Avenue up to Brushwood Drive remains closed to through traffic. The photos below shows the depth and size of the trench and sewer.